Testing and CI
Release validation workflows
This page is an index. Release validation is documented on five pages, one per reader job. Open the page that matches your task.
| Page | Read it when |
|---|---|
| Full Release Validation | The release umbrella: Validation/Tooling SHA binding, release publish, Docker Release, profiles, and recovery. |
| Live and E2E shards | The named live/E2E shards, their coverage, and the images they run in. |
| Package Acceptance | Validating one installable tarball: jobs, candidate sources, suite profiles, and examples. |
| Install smoke and Docker E2E | Install Smoke coverage, the local Docker E2E aggregate and tunables, and release-path chunks. |
| Plugin Prerelease | The separate, more expensive plugin product/package suite and when it is dispatched. |
Where each section moved
Every section heading from the previous single-page version keeps its anchor here, so an existing link such as /ci/release-validation#suite-profiles still resolves. Each entry points at the page that now holds the content.
- Full Release Validation
- Live and E2E shards
- Package Acceptance
- Jobs
- Candidate sources
- Suite profiles
- Legacy compatibility windows
- Examples
- Install smoke
- Local Docker E2E
- Tunables
- Reusable live/E2E workflow
- Release-path chunks
- Plugin Prerelease
Related
Was this useful?